MOCHA | VST2/VST3/AAX/SAL | 11.6 MB
Sitala is a drum plugin and standalone app
Sitala's beauty is simplicity. It's fast and musical. Six knobs. Sixteen pads. Drag and drop. Playable like instrument.
New in Sitala 2.0 - Released June 15, 2023
Apple Silicon Support
All plug-in formats and our standalone run natively on Apple Silicon.
4x4 Layout
Sitala now defaults to an MPC-style 4x4 layout.
Instant Missing Sample Finder
Finds moved samples instantly. Uses Spotlight or Windows Search automatically in the background.
Dark Mode
Sitala now follows the system settings for dark or light modes.
New Hip Hop and Retro Factory Kits
In addition to our 808 kit, Sitala now adds the Future Retro Pop and Hip Hop Ultra factory kits.
There's more new stuff! Sound preview in sample browser, gated mode for each pad, globally mappable MIDI controls, pad selection using MIDI, copy and paste pads, better shape knob mechanics!
Changelog
Updates: official site does not provide any info about changes in this version.
Homepage
Code:
https://licenses.decomposer.de/purchase
Download From 1DL
Code:
https://1dl.net/i2n17yf9aqea
Feel free to post your deComposer Sitala v2.0.0 WiN Free Download, torrent, subtitles, free download, quality, NFO, Dangerous deComposer Sitala v2.0.0 WiN Torrent Download, free premium downloads movie, game, mp3 download, crack, serial, keygen.