What's new
Heroturko

This is a sample guest message. Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

SAP CO Product Costing-By Order Scenario in S4 HANA 1909.

voska89

Trusted Editor
Trusted Editor

SAP CO Product Costing-By Order Scenario in S4 HANA 1909.
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz, 2 Ch
Genre: eLearning | Language: English + .srt | Duration: 24 lectures (8h 31m) | Size: 2.85 GB
Product Costing With Make to Stock Scenario ( Desecrate Manufacturing Process)


What you'll learn:
Organization Structure-Configuration.
Financial Accounting Settings-Configuration.
CO Basic- Organizational Structure Settings-Configuration
Material Management(MM module)Settings-Configuration
Sales and Distribution (SD module)Settings-Configuration
Production Planning (PP Module) Settings-Configuration
FI-MM-SD Integrations Settings-OBYC and VKOA-Configuration
CO-Cost Component Structure OKTZ -Configuration
Costing Sheet - Template allocation Configuration for Over Head Calculation
Costing Variant-Valuation Variant-Configuration
Product Cost by Order-Costing,Valuation Variants,Variance and Settlement -Configuration Settings
Work In Process (WIP) Configuration Settings
Master data-Cost center-Cost element-Activity type-SKF
.Material Ledger Configuration in S4 HANA with Multiple Currencies
Cost Center Planning with SKF, Activity Type and Cost element :KP46-KP26-KP06
Cost Splitting Structure-Mapping- Configuration Settings
Cost Split and Activity type plan rate calculation- KSS4-KSPI
PP master data:BOM-Work Center-Routing-CK11N-Standard Costing
Business Partner(Vendor master data) Creation-Purchase Order creation-Goods Receipt of INPUT Materials
Preliminary Costing, Simultaneous Costing with Production Order AND Month End Closing
CK40N-Standard Costing-Multiple Production Orders creation and postings with Month End Closing
Work in process-Variance Calculation and Settlement
Requirements
Basic Knowledge of Finance and Costing topics.
Description
1. Organization Structure-Configuration
2. Financial Accounting Settings-Configuration
3. CO Basic- Org Settings-Configuration
4. Material Management Settings-Configuration
5. Sales and Distribution Settings-Configuration
6. Production Planning Settings-Configuration
7. FI-MM-SD Settings-OBYC and VKOA-Configuration
8. CO-Cost Component Structure-Configuration
9. Costing Sheet - Template allocation Configuration
10. Costing Variant -Valuation Variant-Configuration
11. Product Cost by Order-Costing, Valuation Variants, Variance and Settlement -Configuration Settings
12. Work In Process (WIP) Configuration Settings
13. Master data-Cost center-Cost element-Activity type-SKF
14. Material Ledger Configuration ( It is mandatory in S4/HANA system).
15. KP46-KP26-KP06
16. Splitting Structure-Mapping- Configuration Settings
17. Cost Split Configuration and Activity type plan rate calculation- KSS4-KSPI
18. BOM-Work Center-Routing-CK11N-Standard Costing
19. Business Partner(Vendor) Creation-Purchase Order creation-Goods Receipt of INPUT Materials
20. Preliminary Costing, Simultaneous Costing with Production Order AND Month End Closing
21. CK40N-Standard Costing-Multiple Production Orders creation and postings with Month End Closing
22. Work in process-Variance Calculation
Who this course is for
CPA , CMA , ACCA , CA , MBA , M Com,B Com students and Professionals, SAP FICO Consultants and End Users.
Homepage
https://www.udemy.com/course/sap-co-product-costing-by-order-scenario-in-s4-hana-1909/

Recommend Download Link Hight Speed | Please Say Thanks Keep Topic Live


 

Feel free to post your SAP CO Product Costing-By Order Scenario in S4 HANA 1909. Free Download, torrent, subtitles, free download, quality, NFO, Dangerous SAP CO Product Costing-By Order Scenario in S4 HANA 1909. Torrent Download, free premium downloads movie, game, mp3 download, crack, serial, keygen.

Top