x64 | Language: English | File Size: 3.8 GB
Windows PE (WinPE) is a small operating system used to install, deploy, and repair Windows desktop editions, Windows Server, and other Windows operating systems.
This is the BOOT MENU for two MBR standards - legacy and UEFI-GPT
- Grub4 boot menu for Dos: Boot to PE Windows, Partition Wizard, Partition Guru, Konboot, Memtest, MHDD, ghost 11.5, HDD regenerator, Active Password Changer. .. and many other useful tools
- Win Pe includes: PE Win 11 pro x64, Win 10 pro x64, Win 10 pro x86, Win 8.1 pro x86, with complete recovery software on Mini Windows: Acronis TrueImage, Norton Ghost, Partition Wizard, Aomei Partition, Section Guru...
- Tools Dos Partition Wizard, Partition Guru, Konboot, Memtest, MHDD, ghost 11.5, hard drive regenerator, Active Password Changer
Support for virus scanning (Kaspersky Rescue, Avira Rescue, Eset, Dr.Web)
- Dos Grub2 tool
- Transfer interface in Dos and windows pe friendly.
* System update and bug fixes
- One-click upgrade supports creating USB-HDD boot easily and conveniently
- Update wifi driver for win pe x64-86, good support for new machines
- Update all lan, Wifi, vega, Graphics, NVIDIA Geforce GT drivers,
- Updated driver for card readers, USB 3.0-3.1 ports for portable set-top boxes
- Update installation Windows 7-8-10 AIO support install win
- Update Hiren't boot 10.0 final
- Win pe supports the following win versions
+ Update Mini Windows 10 32Bit,
+ Update Mini Windows 10 64Bit,
+ Update Mini Windows 11 64Bit,
+ Update Mini Windows 8.1 32Bit_lite
+ Support loading admin with temviewer,
+ Win mini xp: support for machines with a weak configuration
- Dos boot update with win x86 UEFI
- Updated support for machines with NVMe drives for Gen 11 laptops to find and display hard drives in
Windows
pe
- fixed error Acronis true Image 2020 does not allow backup
- Fixed bug when booting win 8.1 pe app icons not showing on screen
- Fixed complete virtual disk error
- fix DrWeb antivirus software error 1746 on win pe x64
* update some programs to the latest version, get more detailed and complete information about the software.
Features between Free and Pro
- The Apps on the new fully updated win
- Nvme intel drive interface gene 7.8,10, 11
- Boo Boo Boo Boo Boo Boo!
- Get Wifi, mouse intel gen 11, 12+
- Support integrated windows installation
- EasyBCD 2.4 -. EasyUEFI Fix computer error
- UEFI boot support application on Dos
- Integrating Micorsoft Net Framwork and C+
- Integrate Test (1) test (1), (b) Test (1)
-.. Integrated Ullman PPI (1) Removal of the patient Mstsc.
- Support phone connection and network sharing will be networked from the phone via the computer
- Support Electric connection thai (MARKING) Divide the number of days
- Support phone connection (R) Divide the power of the phone accessory network
- Fast boot speed, running smooth applications
What's new
- Update MCBoot_vn v 9.1 build 080822 Pro (officially released 08/8/2022) only update Pro version
- Removed Win10Pex64Full (replaced with Win11Pex64Full)
- Update more Drivers to support Audio, recognize M.2 SSD well, for Intel Gen 12 Laptops Fix error of recognizing M.2 SSD drives on Asus laptops ..(asus Gx570HQ game ming)
- Update Driver package good support for the latest LAN + WiFi, (load wifi as soon as you enter win pe)
- Support unplugging USB to open the application still works well
- Supports good identification of M.2 SSD drives of NVMe series: AHCI_RAID- AMD_RAID
- Support display boot mode when entering Win Pe (Legacy_BIOS and UEFI_GPT): Thank you (Lin Tinh) for sharing this feature.
- Update keyboard shortcut support on MCBoot_vn to open features faster*
- Updated software package to latest version
- Add APFS for Windows and Linux File Systems for Windows software support for Macbook- WinToUSB 7.0.1- Rufus.3.19.11911- AOMEI Partition Assistant 9.8.1- ScreenHunter 7 Pro v7. 0.1427- Macrorit Partition Expert 6.1.0- NIUBI Partition Editor 7.9.0- WindowsNTsetup 5.25
HOMEPAGE
Code:
https://hoanchien.blogspot.com/
Download From 1DL
Code:
https://1dl.net/9a6qam606ozi
https://1dl.net/9hwax4ncfzpd
https://1dl.net/mal7iz9crcky
https://1dl.net/ybggacpgcumd
To Support My Work Buy Premium From My Links.
Feel free to post your WinPE MCBoot VN Version 9.1 build 080822 Pro 2022 Free Download, torrent, subtitles, free download, quality, NFO, Dangerous WinPE MCBoot VN Version 9.1 build 080822 Pro 2022 Torrent Download, free premium downloads movie, game, mp3 download, crack, serial, keygen.