What's new
Heroturko

This is a sample guest message. Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

WinPE MCBoot VN Version 9.2 Pro build 180922 x64 Pro 2022

kalpatru

Trusted Editor
Trusted Editor
th-l-EKpd-Ahfv8-Wbs-G7yezkl5-Y2-GOEQn6l28.jpg


WinPE MCBoot VN Version 9.2 Pro build 180922 x64 Pro 2022 | x64 | Language: English | File Size: 3.7 GB

Windows PE (WinPE) is a small operating system used to install, deploy, and repair Windows desktop editions, Windows Server, and other Windows operating systems.

Features
- This is the MENU BOOT for two MBR standards - legacy and UEFI-GPT
- Boot menu Grub4 for Dos: Boot into PE Windows, Partition Wizard, Partition Guru, Konboot, Memtest, MHDD, ghost 11.5, HDD regenerator, Active Password Changer ... and many other useful tools
- Win Pe includes: PE Win 10 pro x64, Win 10 pro x86, Win 8.1 pro x86_Lite, Win 10 pro x64_Lite, with full rescue software on Mini Windows: Acronis TrueImage, Norton Ghost, Partition Wizard, Aomei Partition , Partition Guru.
- Dos tools Partition Wizard, Partition Guru, Konboot, Memtest, MHDD, ghost 11.5, HDD regenerator, Active Password Changer
Support virus scanning (Kaspersky rescue, Avira rescue, Eset, Dr.Web)
- Dos Grub2 . Tool
- Interface in Dos and win pe friendly.

Features between Free and Pro
- The Apps on the new fully updated win
- Nvme intel drive interface gene 7.8,10, 11
- Boo Boo Boo Boo Boo Boo!
- Get Wifi, mouse intel gen 11, 12+
- Support integrated windows installation
- EasyBCD 2.4 -. EasyUEFI Fix computer error
- UEFI boot support application on Dos
- Integrating Micorsoft Net Framwork and C+
- Integrate Test (1) test (1), (b) Test (1)
-.. Integrated Ullman PPI (1) Removal of the patient Mstsc.
- Support phone connection and network sharing will be networked from the phone via the computer
- Support Electric connection thai (MARKING) Divide the number of days
- Support phone connection (R) Divide the power of the phone accessory network
- Fast boot speed, running smooth applications

What's New

- This is the MENU BOOT for two MBR standards - legacy and UEFI-GPT
- Boot menu Grub4 for Dos: Boot into PE Windows, Partition Wizard, Partition Guru, Konboot, Memtest, MHDD, ghost 11.5, HDD regenerator, Active Password Changer ... and many other useful tools
- Win Pe includes: PE Win 11 pro x64, Win 10 pro x64, Win 10 pro x86, Win 8.1 pro x86, with full rescue software on Mini Windows: Acronis TrueImage, Norton Ghost, Partition Wizard, Aomei Partition , Partition Guru.
- Dos tools Partition Wizard, Partition Guru, Konboot, Memtest, MHDD, ghost 11.5, HDD regenerator, Active Password Changer
Virus scanning support (Kaspersky rescue, Avira rescue, Eset, Dr.Web)
- Dos Grub2 . Tool
- Friendly interface in Dos and win pe.
* System updates and bug fixes
- Update 1 click to support creating USB-HDD boot easily and friendly
- Update wifi driver for win pe x64-86, good support for new machines
- Update All Driver lan, Wifi, vega, Graphics, NVIDIA Geforce GT,
- Update Drvier for card readers, USB 3.0-3.1 ports for mobile Boxes
- Update Setup Windows 7-8-10 AIO support install win
- Update Hiren't boot 10.0 final
- Win pe supports the following win versions
+ Update Mini Windows 10 32Bit,
+ Update Mini Windows 10 64Bit,
+ Update Mini Windows 11 64Bit,
+ Update Mini Windows 8.1 32Bit_lite
+ Support loading Admin using temviewer,
+ Win mini xp: support low configuration machine
- Update loading Dos with win x86 UEFI
- Update support for machines with NVMe drives for Gen 11 laptops to find and display hard drives on windows pe
- Fix error auto exit win8.1 pe_Lite
- Fix the error of not recognizing the SSD nvme M2 of samsung and intell and some other brands
- fix error Acronnis true Image 2020 does not allow backup
- Fix error when loading win 8.1 pe does not show application icons on the screen
- Fix full ramdisk error
- Fix error 1746 DrWeb anti-virus software on windows pe x64
- Support standard boot Legacy and Uefi standard Microsoft, Grub2, Xorboot, Mcboot_vn
- Support Bitlocker Unlock Function (unlock by Key)
- Upgrade WinPE to load faster, get better configuration. Fix the drive identification error that can be well supported for gen 11+, (12,14,16 in the future).
- Update more Rst V19 for gen intel chip 400,500,600
- Integrating Micorsoft Net Framework and C++ to support installation of difficult software
- Support install win directly on win pe and fix bypass 2.0 on win 11
- Support Wifi driver, fully integrated Toupad for HP, Dell, Asus, Aser, Macbook Pro, Msi laptops..
- Integrated Test Camera, test Microphone, Connect remote control with Ultraiview, Mstsc.
- Update the feature to convert win pe to Admin mode to support sharing data over the network, when installing win online.
- Supports phone connection and network sharing from phone to computer
- Support Phone Connection (MTP) Share data over the phone
- Support phone connection (RNDIS) Share phone accessories power network
- Supports ISCSI disk storage technology to connect to the server
- Fix the error that Test Camera was black and could not load live images, now it displays very good images on Full HD cameras, gen 10-10-12 laptops

Homepage
Code:
https://hoanchien.blogspot.com/

2534c2c61fdad605e2f32484578a2641.jpg


Buy Premium Account From My Download Links And Get Resumable Support & SUPER Fastest Download Speed


Code:
https://1dl.net/9hki0sjthggm/MCboot_2022_v9.2_build_180922_Pro.part1.rar.html
https://1dl.net/xosc5wr4v8kn/MCboot_2022_v9.2_build_180922_Pro.part2.rar.html
 

Feel free to post your WinPE MCBoot VN Version 9.2 Pro build 180922 x64 Pro 2022 Free Download, torrent, subtitles, free download, quality, NFO, Dangerous WinPE MCBoot VN Version 9.2 Pro build 180922 x64 Pro 2022 Torrent Download, free premium downloads movie, game, mp3 download, crack, serial, keygen.

Top